Volltext

(1)

Dorfstraße 51

D-16816 Nietwerder-Neuruppin

Phone: +49.3391-45.45-0 • Fax +49.3391-45.45-10 E-Mail: order@vivis.de

TK Verlag GmbH

order now www. .de

Air Pollutant Emissions and their Control

– with the focus on waste incineration facilities –

This comprehensive text and practical handbook thoroughly presents the control of air pollutant emissions from combustion processes focusing on waste incinerators. Special characteristics are emphasised and the differences to emission control from combustion processes with other fuels are explained.

The author illustrates the origin and effects of air pollutants from incineration processes, the mechanics of their appearance in the incineration process, primary and secondary measures for their reduction, processes of measuring the emissions as well as the methods of disposing the residues. In particular, the pros and cons of procedual steps and their appropriate combination under various conditions are emphasised.

Moreover, the book contains information and analyses of the emissions situation, the consumption of operating materials and of backlog quantities as well as of the cost structure of waste incinerators with regard to their applied control system.

Furthermore, the author explicates the contemporary legal, scientific and technological developments and their influence on air pollutant emission control. An evaluation of the status quo of air pollutant control at waste incinerators in Germany, practical examples about possible combinations and typical performance data complete the content.

Accordingly, this book is a guideline for planing a reasonable overall concept of an air pollutant control that takes the location and the segregation tasks into consideration. This book is addressed to students, decision makers, planners and the operating practicioners if for example the construction of a new system or the implementation of improvement measures have to be conducted.

published: 2017 120.00 EUR published 2014

50.00 EUR

Available in German and English!

revised versio n

Emissions and Emission Monitoring

Fixed mirror

Focussing mirror Beam splitter

with compensator

Moving mirror

Light source Gas sample Gas sample Collimator

Detector Sample cell

Figure 242: Measurement principle of an FTIR multi-component spectrometer with a Michelson interferometer setup Source:

TÜV Süd Industrie Service GmbH, UBA-Texte 05/08, adapted

splitter where they are brought together to interfere with each another in intensity as they recombine. Depending on the mirror displacement, the interference may be constructive (increasing) or destructive (decreasing). When using polychromatic light, the interference occurs for each wave length so that the interference intensities of the individual wave lengths superpose one another [369].

of the target component and are directed by a focusing mirror to an infrared detector is computed from the recorded interferogram (intensity at detector as a function of mirror displacement) by mathematical Fourier transformation. For quantitative eva- luation, the calculated infrared spectrum is compared with a reference spectrum [380].

An alternative to the Michelson interferometer is the vibration-insensitive RockSolid

9.2.3.3.2 Multi-component measurement by non-dispersive infrared spectroscopy Non-dispersive infrared (NDIR) spectroscopy is based on the absorption of an in- frared spectrum wavelength that is unique to the gaseous component to be detected.

In contrast with dispersive infrared spectroscopy, non-dispersive methods do not spectroscopy is applicable to multi-component analysis, i.e. the simultaneous analysis of several emission parameters, and is frequently also used for raw gas measurements.

detector

Light source Sample cell

Calibration filter Lens

Detector

Filter wheels Chopper

Figure 243: Measurement principle of a multi-component NDIR spectrometer with heated sample gas cell Source: Boneß, M.: Messsysteme und Analysatoren zur kontinuierlichen Prozesskontrolle und Emissionsüberwachung in und Betrieb von Anlagen, Vol. 1, pp. 527–538. Neuruppin: TK Verlag, 2010 As infrared detectors can only detect changes in the infrared radiation, they require a modulated (pulsed) infrared source that is temporarily interrupted by a mechanical

component and selects the spectral region of its absorption band. If several gas com- ponents are to be analysed, chopper wheels covering several infrared spectral regions to calculate the gas concentration, which requires a concentration-independent refer- ence signal for comparison. For this purpose, NDIR analysers may be equipped with absorption band of the analysed component (bi-frequency technique). Alternatively, Continuous Emission Monitoring

hardcover with coloured illustrations

(2)

reatment

History of Flue Gas Treatment

for Waste Incineration Plant IVOO since 1981 to the Present

Fons Doms

1. Status 1981 – Belgian concept 1970’s ...534

2. Status 1991 ...536

3. Status 1998 – Flemish authority demands dioxin removal...536

4. Status 2004 – EU demands removal of NOx ...537

5. Other adjustments – continuous improvement ...537

6. Status 2019 – coupling to the district heating ...538

7. Conclusions ...539

8. References ...539 In Belgium the municipalities are responsible for the household waste. Before 1970 each municipality in Belgium had a dumping place. All the waste from households and industries was dumped there, giving lots of environmental pollution and annoyance.

Especially in the densily populated parts of the country it became practically impossible to find locations for such new dumping places, because they were no more socially accepted. Around 1970 municipalities started to cooperate in intermunicipalities to find a solution for their waste problem.

IVOO (Intermunicipal Association for waste management for Ostend and Ommeland) is erected in 1974 as the intermunicipal organisation for waste management for the town of Ostend and the following five municipalities around: Bredene, Gistel, Middelkerke and Oudenburg: in total more as 144,000 inhabitants. Situated in the middle of the Belgian coast it attracts a lot of tourists.

Firstly, an incinerator was built. From 1990 selective collection of waste was organised with containerparks and door to door collection of packaging waste. In 1998 a facility for the composting of garden waste was built. Nowadays, about 70 % of the municipal solid waste is selectively collected and recycled, only 30 % is treated in the waste-to- energy (W2E) plant.

(3)

reatment

By order of the six communities the IVOO carries out the directives of Flemish management for waste and materials. Its main activities are:

• The organisation of kerbside collection of municipal waste,

• the communication and the sensitisation on waste matters,

• the exploitation of a green compost centre, and

• the exploitation of an incineration plant for residual waste.

Mission

A sustainable management for waste products and materials – circular economy – is the main objective of the organisation. Together with the six communities, it stands for a sustainable waste management: waste prevention, waste recycling and valorisa- tion of raw materials and production of electricity and heat throughout incineration of residual waste.

Figure 1: Ostend Waste-to-Energy facility

1. Status 1981 – Belgian concept 1970’s

When the installation was concepted and built, waste management was the competency of the federal ministry of public health. With subsidies of the ministry an installation was built following their policy, it means little attention for environmental care: the air pollution control was restricted to an ESP for dust removal.

Thanks to the cooperation with WVEM, the former local intermunicipality for electri- city distribution, there was invested in steam boilers and a turbogenerator.

(4)

reatment

The installation included:

• 2 furnaces with air cooled grate; supplied by Seghers Engineering (now Keppelseg- hers); the capacity is nowadays 2*4.5 ton/h or 62 to 65 kton/yr; in the 1980’s it was 25 % higher due to a lower NCV of the household waste before selective collection of recyclables;

• 2 Boilers 35 bar 360 °C 14.5 ton/h; supplied by Denayer (now CMI);

• 2 ESP, supplied by Fläkt (now GE);

• 1 stack with a height of 60 meters. Flow rate of the flue gases: 2*30,000 = 60,000 Nm³/h;

• 1 Turbine + gear + generator, supplied by Acec (now GE). Capacity = 5.5 MWe. Yield is nowadays 500 kWh/ton.

2 Lines

Fly ashes

Bottom ashes

LINE 2 1 Stack

Fan 230-250 aºC

Electrostatic precipitator

filter

220-240 ºC 210-230 ºC

Figure 2: Process flow of the waste incineration plant IVOO in 1981

Super- heater

Eva- porator

Eva- porator

ECO ECO

Boiler 1 Boiler 2 Super- heater

Gear Reduktiekast

Internal heating

Degasing 1.3 bar 110 ºC

1.9 t/h 68 ºC Alternator 5.5 MW

Condensor

Hotwell 51 ºC

26.8 t/h 95.8 ºC

2.2 t/h 6.8 bar 29 t/h 35 bar 360 ºC

1.7 t/h 1.1 bar 24.7 t/h 0.95 bar

Hotwell- pump Feed -

pump Turbine

Figure 3: Process flow of the water-steam cycle

(5)

reatment

2. Status 1991

Since the second state reform of Belgium in 1980 environment is a competency of the regions. Already in 1981 the Flemish authority decided to equip (and support) the Flemish incinerators with a more performant APC.

With subsidies of Flanders a wet scrubber, common for the two lines, is added. It was supplied by Toussaint-Nyssenne (now Munters) and installed by Seghers Engineering.

2 Lines

Fly ashes

Bottom ashes

LINE 2 1 Wet scrubber

1 Stack

Fan 230-250 ºC

Electrostatic precipator

filter

220-240 ºC 65 ºC

Wastewater + sludge treatment

Figure 4: Process flow of the waste incineration plant IVOO in 1991

3. Status 1998 – Flemish authority demands dioxin removal

In 1995 the Flemish authority imposes more stringent operating conditions, under which the removal of dioxins out the flue gases. Per line a semi-wet scrubber with injection of lime and lignite coke is installed.

2 Lines

Fly ashes

Bottom ashes

Dosing screw Injection

pumps

Lignite coke

Lime milk preparation

tanks

LINE 2 1 Wet scrubber

1 Stack

Fan Bag Filter Lime milk

spray dryer

Silo for Quicklime (CaO)

Residual Calcium chemicals Residual

Calcium chemicals 230-250 ºC

Electrostatic precipitator

filter

140-145 ºC 65 ºC

Wastewater + sludge treatment

Figure 5: Process flow of the waste incineration plant IVOO in 1998

(6)

reatment

4. Status 2004 – EU demands removal of NO

x

The Waste Incineration Directive WID 2000/76/EC imposes more stringent operating conditions, under which the removal of nitrogen oxides out the flue gases.

The semiwet scrubbers are converted into dry scrubbers with injection of Sodiumbi- carbonate (reactor becomes evaporation cooler); and the wet scrubber is replaced by a tail-end SCR denox.

The new layout enables to keep a high level of energy efficiency and is only possible with the current flue gas treatment configuration.

2 Lines

Fly ashes

Bottom ashes

Dosing screw Injection

fan Spray Dryer *

Grinder

Lignite coke

LINE 2

1 Stack

Fan

* used for excess water elemination

Silo for BICARTEC

Residual sodium chemicals 230-250 ºC

Electrostatic precipitator

filter

200-205 ºC

190-200 ºC

225 ºC

NH3 SCR

DeNOx (Gas heater)

Heat Recovery Bag Filter

Figure 6: Process flow of the waste incineration plant IVOO in 2004

5. Other adjustments – continuous improvement

In 1997 burners are installed for the reduction of the emissions during start-up and stop. In the same year analysers for continuous control of emissions are installed and a long-term sampling unit for measuring dioxins and furans.

In 1998 the concept of superheaters was changed. In place of horizontal superheaters, vertical ones, with a prolonged lifetime, were installed.

Since 2001 the management system is certified for Quality ISO 9001 and Environmental care ISO 14001.

In 2003 the installation for the production of demineralised water was replaced for Reverse Osmosis (RO) followed with continuous electro-deionisation (CEDI).

(7)

reatment

Since 2004 the boilers are cleaned every two weeks with the detonative cleaning system Detoclean.

In 2008 an additional catalyst is installed in the denox. The operating temperature is decreased (225 => 185 °C); in normal working conditions the burners are no more working, which results in an important saving on gas consumption. For more infor- mation about the low temperature Shell Denox System for removal of NOX and dioxins from waste incineration [2].

Between 2010 and 2018 the membrane walls of the first pass are renewed, cladded with Inconel.

In 2011 the High-Level Control by FuzzEvent is installed for increase of the furnace capacity and reduction of CO-emission [3].

Since 2014 Ready-to-use sodium based sorbent replaces the classical bicar [1].

2014: treatment of bottom ashes before landfilling: recovery of ferrous and non-ferrous metals.

Continuously the measuring and control equipment (speed control turbine, excitation generator, controller of ESP, plc’s, scada etc.) is replaced by recent versions.

6. Status 2019 – coupling to the district heating

In September 2017 an agreement was made with BeauVent – a private operator of district heating in Ostend – for delivery of heat to the future district heating system, which meant the start of the project.

BeauVent has the aim to develop a district heating system with about 15 km of length in Ostend for delivery of mainly rest heat from waste incineration to residential and industrial consumers of heat in the city.

Figure 7: Long-term vision for the district heating system in Ostend

(8)

reatment

IVOO is now installing an heat exchanger of 1.5 MW in the stack, for the delivery of 8,000 MWh per year. Further an heat exchanger of 6 MW (expandable with 5 MW and 4 MW) on superheated steam is installed, for the delivery of 2,000 MWh per year during the peaks.

7. Conclusions

First the concern about the public health led to the construction of a waste incineration plant. Later the environmental concern led to higher environmental requirements.

Nowadays the energy efficiency becomes more and more important.

Since the construction of the waste incinerator from 1979 to 1981 the environmental requirements have several times been strengthened.

By making the right investments IVOO managed to keep the installation up-to-date, compliant to all requirements and still profitable.

8. References

[1] Balland, J.-P.: Ready-to-use Sodium Bicarbonate in Flue Gas Treatment – Experience Feedback –.

In: Thomé-Kozmiensky, K. J.; Thiel, S.; Thomé-Kozmiensky, E.; Winter, F.; Juchelková, D.

(Eds.): Waste Management, Volume 7, Waste-to-Energy. Neuruppin: TK Verlag Karl Thomé- Kozmiensky, 2017, pp. 449-462

[2] CRI Catalyst Company: https://www.cricatalyst.com

[3] Dublix Technology ApS: https://www.dublix.com/solutions/combustion-control 1981 1991 1998 2004 2013 Emission

mg/Nm3

Dust 100 100 30 10 10 < 1

HCl – 100 50 10 10 6

SO2 – 300 300 50 50 7

NOx – 400 400 200 100 95

NH3 – – – 10 10 2

Sb+As+Pb+Cr+Co+

Cu+Mn+Ni+V+Sn 6 0.5 0.5 0.5 < 0.06 Hg – 0.2 0.05 0.05 0.05 0.006 Cd + Tl 0.2 0.05 0.05 0.05 < 0.01

TOC – 20 10 10 10 3

PCDD/F (ngTEQ/Nm3) 0.1 0.1 0.1 < 0.003

Table 1:

Evolution of the emission limit values for the flue gases and average daily emission

Contact Person

Ir. Fons Doms Directeur

IVOO Intergemeentelijke Vereniging voor het afvalbeheer voor Oostende en Ommeland

Klokhofstraat 2 8400 Oostende BELGIUM

Phone: 00 32 - 59 - 55 27 35 Email: fons.doms@ivoo.be

(9)

Dorfstraße 51

D-16816 Nietwerder-Neuruppin

Tel. +49.3391-45.45-0 • Fax +49.3391-45.45-10 E-Mail: tkverlag@vivis.de

Dorfstraße 51

D-16816 Nietwerder-Neuruppin

Phone: +49.3391-45.45-0 • Fax +49.3391-45.45-10 E-Mail: order@vivis.de

TK Verlag GmbH hardc

over with coloured illustrations

order now www. .de

Gewebefilte Gewebefilter H2O

SPT SPT

Ca(OH)2 + HOK Kessel

Saugzug NH4OH

(SNCR)

Reststoff Wäscher H2O

NaOH

NH3

NH4OH Strippe

Dampf

H2O

Kondensator

Abwasser

Dagavo

Kalkmilch H2O

Rezirkulat Abwasser

Emissions-related Energy Indicators

for flue gas treatment systems in waste incineration

The aim of this study is to demonstrate such discrepancies or dependencies between attainable emission reductions and the emissions-generating energy input necessarily incurred by flue gas treatment technologies in attaining those reductions.

The study initially focuses on current investigations and assessments related to this issue, as well as on the legal emission requirements. Due to the wide range of components involved in flue gas treatment systems and their consequent numerous combination possibilities, six different system Variants are presented and compared. It is notable in the context of the present study that both single and two-stage or multi-stage systems are considered in the set of Variants, which differ not only in their structure and additive use but also in their separation capacity. These six basic Variants reflect the systems frequently employed in practice and represent non-congruent procedural steps with their respective target emission levels.

Based on the fact that each of these Variants is already in operation in thermal waste incineration plants, the assessment draws on many years of existing operative experience.

The individual energy demands for the Variants described are determined on the basis of mass, material and energy balances.

Evaluation criteria for energy demand at the different emission reduction ratios are educed from the formulation of emissions-related energy indicators. This establishes a set of tools with which to assess emissions-generating energy demand in the context of emission reduction ratios.

Rudi Karpf

Emissions-related energy indicators

for flue gas treatment systems in waste incineration

Emissions-related energy indicators

Author: Rudi Karpf Published in: 2014 Hardcover: 314 pages

ISBN: 978-3-944310-14-5 Price: 30.00 EUR

(10)

Bibliografische Information der Deutschen Nationalbibliothek Die Deutsche Nationalbibliothek verzeichnet diese Publikation in der Deutschen Nationalbibliografie; detaillierte bibliografische Daten sind im Internet über http://dnb.dnb.de abrufbar

Thiel, S.; Thomé-Kozmiensky, E.; Winter, F.; Juchelková, D. (Eds.):

Waste Management, Volume 8 – Waste-to-Energy –

ISBN 978-3-944310-42-8 Thomé-Kozmiensky Verlag GmbH

Copyright: Elisabeth Thomé-Kozmiensky, M.Sc., Dr.-Ing. Stephanie Thiel All rights reserved

Publisher: Thomé-Kozmiensky Verlag GmbH • Neuruppin 2018 Editorial office: Dr.-Ing. Stephanie Thiel, Dr.-Ing. Olaf Holm,

Elisabeth Thomé-Kozmiensky, M.Sc.

Layout: Janin Burbott-Seidel, Ginette Teske, Roland Richter, Cordula Müller, Sarah Pietsch, Gabi Spiegel, Lena Bischkopf

Printing: Universal Medien GmbH, Munich

This work is protected by copyright. The rights founded by this, particularly those of translation, reprinting, lecturing, extraction of illustrations and tables, broadcasting, micro- filming or reproduction by other means and storing in a retrieval system, remain reserved, even for exploitation only of excerpts. Reproduction of this work or of part of this work, also in individual cases, is only permissible within the limits of the legal provisions of the copyright law of the Federal Republic of Germany from 9 September 1965 in the currently valid revision. There is a fundamental duty to pay for this. Infringements are subject to the penal provisions of the copyright law.

The repeating of commonly used names, trade names, goods descriptions etc. in this work does not permit, even without specific mention, the assumption that such names are to be considered free under the terms of the law concerning goods descriptions and trade mark protection and can thus be used by anyone.

Should reference be made in this work, directly or indirectly, to laws, regulations or guide- lines, e.g. DIN, VDI, VDE, VGB, or these are quoted from, then the publisher cannot ac- cept any guarantee for correctness, completeness or currency. It is recommended to refer to the complete regulations or guidelines in their currently valid versions if required for ones own work.

Abbildung

Figure 242:  Measurement principle of an FTIR multi-component spectrometer with a Michelson  interferometer setup  Source:
Figure 1:  Ostend Waste-to-Energy facility
Figure 3:   Process flow of the water-steam cycle
Figure 5:   Process flow of the waste incineration plant IVOO in 1998
+3

Referenzen

ÄHNLICHE DOKUMENTE

The case of Attica In Attica region (capital of Greece) the daily production of Municipal Solid Waste (MSW) is estimated at 6,000 tons.. This means 2 million tons per year, from

Mechanical Biological Treatment (MBT) is a generic term for the integration of a number of waste management processes such as materials recovery facilities (MRF), refuse derived

• update national and regional (voivodship) waste management plans, integrating a cohe- rent investment approach for MSW treatment facilities that aims to meet EU targets for

It is important that the correct heating values of the waste fuel(s) be accurately deter- mined to ensure proper design and continuous operation of the Facility. Waste fuel

EU waste legislation sets very clear requirements in this respect: the waste hierarchy gives clear priority to prevention, re-use and recycling of waste, and its binding targets

The main problems of waste disposal comprise reduction of volume, preventing from pathogenic hazards, protecting of the environment and the recovery of resources. Inci- neration

The ÖWAV provides its over 2.000 members a sector network and a neutral and independent plat- form for all specialized experts and involved professional groups as well as

The reduction of MSW couple with the implementation of MSW management policies at a global level as a consequence of technology transfer and capacity building in less