Offshore Windfarms

BSH Hamburg

Bernhard-Nocht-Str. 78 · 20359 Hamburg

Phone: +49 (0) 40 3190-0 · Fax:+49 (0) 40 3190-5000

BSH Rostock

Neptunallee 5 · 18057 Rostock

Phone: +49 (0) 381 4563-5 · Fax: +49 (0) 381 4563-948 M53_001_06/15

www.bsh.de | posteingang@bsh.de

Offshore Grid Connections

The BSH also approves the grid connections to off- shore windfarms. Eight of nine connections approved so far are in the North Sea, one in the Baltic. In the North Sea, due to the long distances and possible power losses, the innovative high-voltage, direct cur- rent technology is used for grid connections. The only exception is the alpha ventus windfarm that is relatively close to the shore. It was connected using an alternat- ing current system.

The grid connections in the Baltic Sea will likely use alternating current systems as well. The windfarms are situated nearer to the coast and so the power loss with those systems will be acceptable while investment costs for equipment are lower.

To support windfarm developers and investors, the BSH developed standards for environmental assess- ment, construction and ground investigation of offshore windfarms.

More information can be found at the BSH website:

http://www.bsh.de/en/Marine_uses/Industry/Wind_

farms/ index.jsp

(2)

!

!

!

!

!

! !

!

!

! !

! !

!

!

!

!

!

!!

!

!

!

! !

!

!

!

!

!

!

!

!!!!!!!!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !!!!

!

!

!

!

!

!

Bremerhaven Wilhelmshaven

Emden

Büsum

Offshore Windfarms in operation under construction approved

application submitted Grid Connections

in operation under construction

North Sea

Territorial Waters EEZ

1

4

11

10 3 7 6

2

5

9 12

13 14

!

!

!

!

!

!

! !

! !

! !

!

!

!

!

!

!

! ! !

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!!!!!!

!

!! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!!

!

!

!

!!

!

!

!

!!!!!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!!!!!!!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

! ! !

!

!

!

!!

!

!!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

! ! ! ! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

! ! ! ! !

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

Rostock

Baltic Sea

Territorial Waters

EEZ 8

N e t h e r l a n d s N e t h e r l a n d s

D e n m a r k

D e n m a r k S w e d e nS w e d e n

G e r m a n y G e r m a n y North Sea

Baltic Sea

offshore windfarms in the German EEZ

Offshore Wind Energy

The Federal Maritime and Hydrographic Agency (Bundesamt für Seeschifffahrt und Hydrographie – BSH) is the responsible agency for the approval of offshore windfarms in the German exclusive eco- nomic zone (EEZ) in the North Sea and Baltic Sea.

A windfarm can only be approved if

• it has no adverse effects on the safety and effi- ciency of maritime navigation or defence issues,

• it is no danger to the marine environment or bird migration,

• other requirements of the Marine Facilities Ordi- nance (SeeAnlV) or public rules and regulations are complied with.

Offshore Windfarms in the German EEZ

Since the beginning of the development of offshore wind energy in the EEZ in 2001 the BSH has ap- proved 31 windfarms in the North Sea and three in the Baltic Sea, with a total of 2052 and 240 turbines respectively.

The first offshore windfarm under construction was alpha ventus. Its 12 turbines started to operate in 2010 about 35 km to the North of Borkum. Since then 4 further windfarms followed. Currently, 9 windfarms are under construction, one of those in the Baltic Sea.

No. offshore windfarm permit holder approved no. of

turbines megawatts under construction

since trial operation in operation

1 alpha ventus Deutsche Offshore-Testfeld und

Infrastuktur GmbH & Co. KG 09.11.2001 12 60 08/2008 since April 2010

2 BARD Offshore 1 Ocean Breeze GmbH & Co. KG 11.04.2007 80 400 05/2009 since August 2013

3 Meerwind Süd/Ost WindMW GmbH 16.05.2007 80 288 07/2012 since Februar 2015

4 Dan Tysk Dan Tysk Offshore Wind GmbH 23.08.2005 80 288 12/2012 since March 2015

5 Trianel Windpark Borkum Trianel Windpark Borkum

GmbH & Co.KG 13.06.2008 40 200 08/2011 since June 2015

under construction

6 Nordsee Ost Essent + Wind Nordsee Ost Planungs- und

Betriebsgesellschaft mbH 09.06.2004 48 295 07/2012

7 GlobalTech I Global Tech I Offshore Wind GmbH 24.05.2006 80 400 07/2012

8 EnBW Windpark Baltic 2 EnBW Baltic 2 GmbH & Co. KG 06.04.2005 80 288 08/2013

9 Borkum Riffgrund 1 Borkum Riffgrund I Offshore Windpark A/S

GmbH & Co. oHG 25.02.2004 77 277 08/2013

10 Amrumbank West E.ON Kraftwerke GmbH 09.06.2004 80 288 12/2013

11 Butendiek OWP Butendiek GmbH & Co. KG 18.12.2002 80 288 04/2014

12 Gode Wind 01 Gode Wind I GmbH 28.08.2006 55 330 06/2015

13 Gode Wind 02 Gode Wind 2 Offshore Wind Farm P/S GmbH

& Co. oHG 27.07.2009 42 252 04/2015

14 Sandbank Sandbank Offshore Wind GmbH 23.08.2004 72 288 06/2015

Referenzen

ÄHNLICHE DOKUMENTE

First some definitions, when referring to language technology, it is taken to mean the software on which applications are based, for example a machine trans- lation (MT)

Where the favorable tariff treatment only applies to certain products in a tariff position, you will have to declare the goods under the newly created

Jody Ray Bennett considers what impact emerging powers such as China might have not only on Arctic security, but also on how the international system will resolve future

Modelling and scenario analysis work at IIASA as part of the Global Energy Assessment has found efforts to improve end-use efficiency dramatically increase the options available

After the mode is canceled, the line data, which has been sent in the horizontal display period, is written in the display RAM at the time of the next trailing edge of the LP signal.

The pigment responsible for the bright-yellow color of the stalk bases of Leccinum chromapes is methyl isoxerocomate, which is accompanied by lesser amounts of isoxerocomic acid

11:30-13:00 Meeting with survivors Yehudit Yerushalmi and Vera Dotan Anna Stocker, European Department, ISHS, Yad Vashem 13:00-14:00 Lunch Break. 14:00-14:30 Reflections on

a. by saving time and resources otherwise devoted to re-inventing known technology, the transfer of.. technology from advanced industrial economies normally speeds up the