214 | INTERPRAEVENT 2016 – Extended Abstracts

INTRODUCTION

The Department of Olancho covers 23,905 km2 with 500,000 inhabitants, living in highly vulner- able rural areas. The topography is hilly; mostly protected rainforests characterize the area. Even so, intense activity takes place as part of the agricul- tural process of their conversion to cultivation and grazing areas. Traditional practices involve burning that regularly spreads out of control and become large forest fires that increase erosion. Tropical cyclones affect the area almost on an annual basis.

This combination of frequent natural events, exposure and misuse of natural resources regularly leads to major material damage and even deaths.

The Swiss Red Cross has been working in partner- ship with the Honduran Red Cross since 1998 after Hurricane Mitch, implementing reconstruction projects in various regions. As from 2005 and starting in Olancho, projects increasingly focused on disaster risk reduction, scaling up since 2009.

The concept and practice of risk management applied in Olancho includes efforts towards reduc- ing exposure to hazards, lessening the vulnerability of people and property, wise land management and improved preparedness to adverse events. Risk management is conducted comprehensively at the community, municipal and school level. The first step consists in performing risk assessments, includ- ing climate, disaster and health risks.

OBJECTIVE AND METHODS OF THE RISK ASSESSMENTS Risk assessments aim at providing the relevant information basis for communities, authorities and project interventions. Combining the populations‘

traditional knowledge with scientific analysis (hydrology, geomorphology and land use), risk assessments strive to make the communities and authorities understand the root causes of the environmental problems that build up the current risks. Risk assessments are conducted for each municipality (see figure 1). They identify the main

critical sites in the territory, including threats, vul- nerability and risk level. The integration of tradi- tional and scientific knowledge is key not only for valid results but also for the creation of a common understanding and ownership for all measures to be implemented by all involved stakeholders.

Multi-temporal analyses are performed to deter- mine the advance of the agricultural frontier that leads to degradation.

The studies provide technical recommendations for the short, medium and long term for each critical site. These are used to select the communities involved and to implement mitigation techniques such as soil conservation, slope stabilization and reforestation, and early warning systems. These techniques are easy to implement and cheaper compared to traditional civil engineering works.

The recommendations also serve as proposal for a municipal risk reduction plan incorporated into the Strategic Municipal Development Plan. This gives relevance to the subject and enables the authorities to allocate more resources and response actions.

RESULTS

At the local level, communities know their expo- sure to the existing threats (see figure 2). Com- bined with training provided by the project they can respond appropriately. Community develop- ment is guided towards safe zones. As co-benefit, many critical sites have become productive land, resulting in increased benefits. Municipal and Local Emergency Committees which traditionally were active only in emergency response, have expanded

Figure 1. Risk assessment process

IP_2016_EA370

Risk assessment for improved land management from local to municipal level: example of Olancho, Honduras

Anton Joehr1; Carlos Montes, Agricultural Engineer2; Christina Aebischer, Geographer1

HAZARD AND RISK ASSESSMENT (ANALYSIS, EVALUATION)

(2)

INTERPRAEVENT 2016 – Extended Abstracts | 215

their focus towards prevention and mitigation activities.

At the municipal level, risk assessments foster development planning and territorial management.

These help to determine the potential land use and generate use comparison maps (based on the map of potential use of the land and the map of the current use of the land), which reflect inappropri- ate land use that contributes to its degradation and instability. Based on these, municipal authorities have issued „No burning“ and „Safe Sites“ Ordi- nances. However, getting the authorities to base their decisions on the assessments‘ recommenda- tions - without the customary political cronyism - remains a challenge, considering the constant turnover in authorities and the municipalities‘

economic constraints.

CONCLUSION

Risk assessments are invaluable tools for impro- ving risk management; they are the basis for risk informed decision-making at all levels. Incorporat- ing recommendations into Strategic Municipal

Development Plans has allowed an increase in projects focusing on these issues. Municipalities and communities have increased awareness of environ- mental problems and engage in prevention and mitigation actions (relocation of housing, reforesta- tion, stabilisation of hillsides, etc.). These have served as a frame of reference for other State organisations and private NGOs. However, develop- ing them is difficult due to the lack of statistical information regarding hydrometeorology (mainly with regard to droughts) and damages and/or losses from previous events. National cartographic infor- mation is extremely out of date (including map sheets or aerial photos) and very difficult to obtain.

As for the gathering of field data, the size of the territory and the complex situations in terms of access to some areas also hinder efforts. Even so, we believe that it is well worth it, as the benefits achieved are greater than the effort involved.

Communities are on their way towards achieving balanced processes for managing their resources and are more resilient to possible effects of future adverse events.

KEYWORDS

participatory risk assessment; risk management; risk mapping; community based approach; resource management

1 Swiss Red Cross, Bern, SWITZERLAND, Anton.Joehr@redcross.ch 2 Swiss Red Cross / Honduran Red Cross

ú

"

""

""

"

""

"

"

""

"

"

"

""

"

"

""

""

"

"

"

"

"

"

"

"

"

"

""

"

""

"

" """

"

"

""

"

"

"

""

""

""

""

" """"""

""

"

"

"

"

""""

""""""""

"

""""

"

"

""

"

"

"

"

""

"

"

"

"

" "

""

"

"

"

"

"

"

"

"

"

"

"

"

""

"

Quebrada Barrios 65

64

12 622000

622000

622500

622500

623000

623000

623500

623500

624000

624000

624500

624500

1644000 1644000

1644400 1644400

1644800 1644800

1645200 1645200

1645600 1645600

1646000 1646000

M A PA D E TA L L A D O D E A M E N A Z A S - S I T I O S C R I T I C O S N o . 1 2 , 6 4 Y 6 5 M U N I C I P I O D E C ATA C A M A S - D E PA R TA M E N TO D E O L A N C H O - H O N D U R A S

M A PA N o . 8 Macroubicación del municipio

H O N D U R A S

NICARAGUA CATACAMAS

1:10,000 Proyecc ión Tra nsvers al de Mercato r

W GS 84. UTM Zo na 16 N orte ESTUDIO DE AMENAZAS NATURALES

DEL MUNICIPIO DE CATACAMAS, OLANCHO, HONDURAS

0 125 250 500 750

Metros

·

SIMBOLOGIA CONVENCIONAL L E Y E N D A

Dirección Deslizamiento

#Caida Bloques

! .Deslizamiento Superficial

Flujos Deslizamientos

Alto Medio Bajo Tipo de Llanura

Actual Intermedia Curva intermedia (20m) Curva suplementaria, intérvalo medio (10m) Curva índice (100m) Ríos Perennes Río Intermitentes Caminos principales Caminos secundarios Veredas

"Caserios

Infraestructura en Riesgo

"Casas

nEscuela

! PPozo

kUNA

úPuente

Tanque A.P Camino en riesgo

! (scSitios Críticos SC - 12

Amenaza: Flujos de Lodos y Deslizamiento Riesgo: Alto.

Elementos expuestos:

Cinco casas Lugar: Talgua Coordenadas:

E623059.19 N1644273.06

SC - 65 Amenaza: Inundación Riesgo: Alto.

Elementos expuestos:

Caja Puente existente, caminos y calles.

Lugar: La Unión Talgua Coordenadas:

E623277.43 N1644943.46 SC - 64 Amenaza: Inundación Riesgo: Alto.

Elementos expuestos:

10 casas, camino, calles, tendido eléctrico y tubería de agua potable.

Lugar: La Unión Talgua Coordenadas:

E623001.90 N1645458.98

Figure 2. Hazard map of critical sites in the municipality of Catacamas, Olancho, Honduras

Referenzen

ÄHNLICHE DOKUMENTE

We determined the germination rate, 3-week fresh weight, time to first flowering, and seed weight of the transgenic plants to evaluate whether the expression of these marker

The processes of decision-making and decision analysis to support it should use the best available information about the biophysical characteristics, their changes and

Clinical risk management is a specific form of risk management, focusing on direct and indirect clinical and patient-related processes, physicians and staff,

Beyond differences in how risks a r e evaluated, political organi- zations cope with the uncertainties inherent in risk management in ways very different from t h a

A web application including interactive maps for the visualization of model results has been developed to show risks for each municipality and hazard

In total 25 people - including regional authorities (n=6), national agencies and ministries (n=3), local authorities (n=10), private sector (n=2) and aca- demic research

Whether the stakes be high (with two major management restrictions: the greatest continuity of service possible and maintenance of the highest level of safety) or less

2001, Malaria vector control: insecticides for indoor residual spraying, World Health Organization, Geneva, WHO/CDS/WHOPES/2001.3.. 2003, "Safety, efficacy and determinants