A way to higher productivity in construction

(2)

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 2

Peter Scherer

University of Applied Science and Arts Northwestern Switzerland Institut for Virtual Design and Construction

Head of future education in Virtual Design and Construction

professional interests

VDC | IPD | BIM | processes | automation | energy | “lean”

active in associations

GNI | SIA | Die Planer. | CEN | ISO | buildingSMART International

Working groups

SIA MB 2051 | SIA D0270 ff | CEN/TC 442 | ISO

Private

married | 2 kids | photographer | ski tours | hiking

14.10.19

Source: Peter Scherer, FHNW

(3)

University of Architecture, Construction and Geomatics

Architecture Civil Engineering

Energy Geomatics

R&D

Education

Continuing Education

Services built

environment

(4)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 4

international collaboration Stanford University – University of Oslo

Source: Peter Scherer, FHNW

(5)

What do we really know about productivity?

(6)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 6

Do we have a strategy to improve?

Source: Peter Scherer, FHNW

(7)

What do we know about processes in design and construction?

Results from over 40 similar workshop experiments with 500 different persons from design, construction and operation:

- there is almost no time spent on organizing the work - tasks are always underestimated, until just before

the work should be completed

- results are not checked before they are delivered - Blaming each other is the explanation for the

bad result

(8)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 8

Reflection

Source: Peter Scherer, FHNW

(9)

silos

(10)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 10

rethink design and construction

(11)

drywall frames prefabrication increases productivity of 25 %

(12)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 12

example of self-optimization from practice

Source: Fischer, Ashcraft, Reed, Khanzode, 2017

(13)

What is really valuable for the client?

(14)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 14

Virtual design and construction, VDC

Source: Peter Scherer, FHNW according to Prof. Dr. Martin Fischer, CIFE

(15)

Integrated Project Delivery, IPD

“Collaboration and information sharing is a cultural attitude and not a

contractual agreement.”

(16)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 16

How can productivity be increased?

(17)

Fundamental changes are necessary

(18)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 18

design and construction is complex and not simply complicated

Source: System Uber, 2018

Uber as a system is complicated but not complex

Solution: primarily technological

Design and construction as a system is complex

Solution: primarily procedural

Source: https://www.ingkh.de/recht/mediation-im-bauwesen/

(19)

Dealing with complex systems

(20)

14.10.19

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 20

Dealing with complex systems

(21)

Productivity

(22)

Chaning project delivery towards industrialisazion

22

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 14.10.19

Source: Journal of the construction devision, 1976

(23)

“If you digitize a fu**ing process, then you will have fu**ing digital process”

translated from German, original quote by

(24)

24

«Culture eats strategy for breakfast»

Peter Ferdinand Drucker, Pioneer of modern management theory

© 2019, Peter Scherer, Institut for Virtual Design and Construction FHNW 14.10.19

Referenzen

ÄHNLICHE DOKUMENTE

A partial spread is an (n, ?, 2k; k) constant dimension code, i.e., a constant dimension code with the maximum possible minimum subspace distance, given the dimension k of

Aber die Anzahl der Vortheile ist damit nicht erschöpft, ihr grösster liegt noch darin, dass eine Anzahl neuer künst- lerischer Motive entsteht, deren Durch- bildung dem Künstler

Aber die Anzahl der Vortheile ist damit nicht erschöpft, ihr grösster liegt noch darin, dass eine Anzahl neuer künst- lerischer Motive entsteht, deren Durch- bildung dem Künstler

This association is simple to implement in the case of a recursive descent parser: program statements implementing the attribute rules are simply interspersed within the

Le standard Minergie-A est atteint à l’aide d’une installation photovoltaïque relative- ment imposante, qui couvre non seule- ment le besoin en chaleur, comme cela est requis pour

22 When the outcome of a construction contract can be estimated reliably, contract revenue and contract costs associated with the construction contract shall be recognised as

We have shown in [2] that the Cuntz–Pimsner algebra of a product system is the right analogue of the crossed product for monoid actions by proper C ∗ -correspondences.. An

© 2018, Peter Scherer, Institut Digitales Bauen FHNW Source: Peter Scherer, FHNW 06.09.18. Source: Peter