The Lawyer | 10 October 2016 31

Arbitration

BRIEFING:

Switzerland

In virtually every contract negotiation, parties exchange drafts. Typically, parties do not expect to be bound by any of the terms contained in the drafts until they sign the contract.

However, in its decision dated 18 February 2016 (BGer 4A_84/2015) the Swiss Federal Supreme Court found that in exceptional circumstances an arbitration clause contained in an unsigned contract draft can nonetheless bind the parties.

An Iranian and a Cypriot company were negotiating a framework agreement containing an arbitration clause.

The Iranian company returned a fi rst draft with modifi ca- tions and comments including a proposal that disputes be resolved before a diff erent arbitral institution and at a diff er- ent arbitral seat. The Cypriot company sent back a revised draft stating, however, that it would not accept a change of seat. The originally proposed arbitration clause remained in the draft and was subsequently neither negotiated nor modifi ed in a further exchange between the parties.

The Cypriot company then sent its last version of the draft agreement for signature, to which the Iranian com- pany replied that the draft was with its legal department for approval. The agreement was ultimately never signed.

The Cypriot company later initiated arbitration proceed- ings on the basis of the arbitration clause in its last version of the agreement. The sole arbitrator rendered an award accepting jurisdiction. The Iranian company challenged the sole arbitrator’s fi nding that it was bound by the arbitration clause and fi led a motion to set aside the award.

Owing to the narrow grounds on which arbitral awards may be set aside in Switzerland, the Swiss Federal Supreme Court conducted a restricted examination. Still, the rea- soning of its decision makes it clear that, by relying on the doctrine of separability, the parties were bound by the arbi- tration clause regardless of the status of the main contract.

The court considered that in exceptional circumstances parties may have entered into an arbitration agreement irre- spective of whether the main contract is signed; for example, where parties have exchanged numerous drafts of the main contract that included initial modifi cations to the arbitra- tion clause and subsequently left the clause unchanged in one or more exchanges. This could represent the common intention of the parties to resolve disputes by means of this arbitration clause and thus bind the parties. Therefore, even if the main contract is not concluded, a party could still

initiate arbitration proceedings by relying on the arbitration clause in the last version of the contract and claim damages for breach of pre-contractual duties.

In practice, this decision by the Swiss Federal Supreme Court will increase legal uncertainty:

A party, considering that its counterparty did not nego- tiate in good faith, faces the tricky question whether to fi le its claim before the arbitral tribunal that was provided for in the draft contract or before the state court that would otherwise be competent to hear such claims.

Similarly, the party dragged into arbitration on the basis of an arbitration clause in a draft contract, to which it believes it never bindingly agreed, will need to consider whether to object to the arbitral tribunal’s jurisdiction.

Finally, the arbitral tribunal whose jurisdiction is chal- lenged will fi rst have to decide the diffi cult question of whether or not the exchange of drafts establishes the parties’

intention to agree to arbitration.

Needless to say, parties wish to be in control of the point in time in which a contract, including any dispute resolution clause, becomes binding. Therefore, to avoid unnecessary debates and disputes, lawyers negotiating contracts are well advised:

to expressly declare when sending or receiving the fi rst draft containing any arbitration clause that their client does not wish to be bound by the arbitration clause until the main contract is signed. Such a declaration should dispel any doubts as to whether the parties entered into an arbitra- tion agreement prior to the signing of the main contract. In its decision, the Swiss Federal Supreme Court indeed pro- posed to adopt such an approach to avoid legal uncertainty;

to separately agree on arbitration at the beginning of negotiations (for example, in a letter of intent) if the parties indeed want arbitration to apply prior to the conclusion of the main contract so that any alleged breach of a pre-con- tractual duty can be brought before an arbitral tribunal.

The scenario under which the parties’ conduct can in good faith be construed as an agreement to arbitrate is to be distinguished from cases in which a party’s off er to arbitrate is simply met by silence. In another recent decision dated 9 March 2016 (BGer 4A_618/2015; BGer 4A_634/2015), the Swiss Federal Supreme Court declared that such silence neither met the formal nor the substantive requirements for an acceptance to arbitrate.

Walder Wyss Ltd.

Seefeldstrasse 123, Zurich, Switzerland Tel: (0041) 58 658 58 58

Fax: (0041) 58 658 59 59

E-mail: michael.feit@walderwyss.com;

michael.cartier@walderwyss.com Web: www.walderwyss.com By Michael Feit (top)

and Michael Cartier, Walder Wyss

Bound before signing on the dotted line

In a case between an Iranian company and a Cypriot company, the mere exchange of contract drafts was construed as an agreement on arbitration

TL_101016 31

TL_101016 31 06/10/2016 12:1606/10/2016 12:16

Referenzen

ÄHNLICHE DOKUMENTE

”"“" ° enormous waste takes place, although if a chargeis madein accordance wit‘1 the quantity delivered it is said to provide an excuse for pe130ns to limit themselvesin

12.5.2 If one is able to accept the possibility that such or such a contract may be qualified as void, and that regardless of terms it is impossible to be without a contract, then

We give an example of a pure group that does not have the independence property, whose Fitting subgroup is neither nilpotent nor definable and whose soluble radical is neither

Partners of the SPV, once multiparty arbitration is underway may rather compromise their claims with downstream contractors or other parties, if the cost-benefit

Political parties have a unique role to play in mediating state- society relations and shaping the social contract.. However, in many fragile contexts weak and dysfunctional

Automation of the analytical process as provided by MHSA guaranteed reproducibility over the whole microorganism life cycle, the accurate control of process parameters

For industry performance comparisons (Section 4), the quasi-competitive case has two clear-cut welfare results that are independent of the nature of returns to scale: welfare

If the employer unilaterally orders home office work due to the current situation in connection with the coronavirus, the employer would have to provide the employee with