• Keine Ergebnisse gefunden

We then analysed differences in outcomes based on those studies above, and below, the median year of baseline assessment

N/A
N/A
Protected

Academic year: 2022

Aktie "We then analysed differences in outcomes based on those studies above, and below, the median year of baseline assessment"

Copied!
1
0
0

Wird geladen.... (Jetzt Volltext ansehen)

Volltext

(1)

Supplementary Material 3: Comparisons based on estimated year of baseline assessment

Not many papers reported the exact years during which baseline assessments were carried out. So, to facilitate this analysis we used the date of publication and any information in the paper about the mean age of assessment in childhood. It was not possible to estimate this for some studies (because the study was cross-sectional, or there was not adequate information in the paper).

We then analysed differences in outcomes based on those studies above, and below, the median year of baseline assessment. (Median = 1988)

Supplementary table: Outcome scores based on median split of estimated baseline year of assessment

Outcome category: Before median

year After median

year Z-test of two proportions Z score; p-value

Good 17.5% 27.8% 3.646; <0.001

Fair 27.4% 24.3% 1.020; 0.308

Poor 51.9% 42.0% 2.869; 0.004

Referenzen

ÄHNLICHE DOKUMENTE

— and its different roles, from its apparently ornamental role in the Ionic order, to its more immediately conceptually-loaded role in Renaissance painting or Baroque

Die 6 MV Beschleunigeranlage wurde von High Voltage Engineering Europe (HVEE) entworfen und 2010 im Institut f¨ur Kernphysik der Universit¨at zu K¨oln instal- liert.. Die

Their location is shifted, because the change of the rising and setting direction along the horizon is smaller during the quarter days and solstices compared to the changes during

This is financed by another part of the business model, usually renting out meeting rooms and private workspace, as well as offering extra services like F&amp;B. Resources workspace,

The most important example is the synergy between the register allocation and the instruction scheduler he scheduler tends to do much better at scheduling a block in which most of

The giant water box is collecting large amounts of chain-forming diatoms from the surface layer at seafloor depths between 300 and 400 m.. The planktologists have finished a

The 2012 business climate barometer from the standpoint of foreign investors, released at the end of October and drawn up by the IESE business school and the government- run Invest

Hammerschmidt (Hrsg.): Proceedings of the XXXII Intemational Congress for Asian and North African Studies, Hamburg, 25th-30th Augusl 1986 (ZDMG-Suppl.. century locally