Flood protection for the Danube in Lower Austria - development and outlook

N/A
N/A
Protected

Academic year: 2022

Aktie "Flood protection for the Danube in Lower Austria - development and outlook"

Copied!
2
0
0

Wird geladen.... (Jetzt Volltext ansehen)

Volltext

(1)

42 | INTERPRAEVENT 2016 – Extended Abstracts

INTRODUCTION

This paper reports on the development of the measures taken to protect against floods along the Danube River in Lower Austria (starting with the cut-off in Vienna and the mobile flood protection systems currently being implemented along the Danube River in Lower Austria), taking into account the essential framework conditions (World Heritage site).

HISTORICAL DEVELOPMENT

Areas along the Danube River in Lower Austria have always been exposed to what have been at times, devastating floods. The following floods in particular are referred to here (see photo showing past flood levels):

– 1501: The highest floods ever observed on the Danube, formed the basis for assessing improve- ments to flood protection systems in Vienna (discharge approximately 14,000 m3/s)

– 1862: (~ 2002) Premise for launching the 1st Vienna Danube regulation

– 1954: The worst flood in the 20th century triggered the action to improve the flood protec- tion systems in Vienna (2nd Vienna Danube regulation „Danube Island“)

– 1991: (approx. HQ30), premise for launching the Krems/Stein flood protection project for the mobile flood management system

– 2002: (approx. HQ100), premise for the intensive expansion of the existing flood protection facili- ties along the Danube in Lower Austria.

Localised measures were enforced in the 14th and 15th century in order to safeguard the shipping on the Danube.

The first concrete plans designed at providing flood protection were drawn up at the beginning of the 19th century and subsequently implemented in 1875 with the cut-off in Vienna. The protective

structures only began to expand on a nationwide basis after the floods of 1991 and 2002.

In Lower Austria (NÖ), the individual municipali- ties are responsible for the construction of flood protection systems, however, if the facilities are to spread over several municipalities, it is also possible for water associations to be set up. According to the Hydraulic Engineering Assistance Act (WBFG), federal funds can be granted for the Danube repre- senting as much as up to 80% of the overall cost.

According today‘s point of view, a large part of the flood protection measures along the Danube River in Lower Austria should be completed by 2020.

FRAMEWORK CONDITIONS AND OUTLOOK

The complexity involved in implementing flood prevention measures along the Danube River in Lower Austria stems from the actual location of the towns and villages; many are in the UNESCO World Heritage site of Wachau or they contain old Towns and sites that are centuries-old (Ybbs, Melk or Stein). That is why it would be simply inconceiv- able to erect a classic flood protection system in these areas, such as a dam or permanent wall.

In order to find a satisfactory solution for all the parties involved, an advisory design council was set up with representatives from ICOMOS AUSTRIA (Austrian National Committee of the International Council on Monuments and Sites), experts on the preservation of the townscape and nature conser- vation, as well as the Federal Ministry for Educa- tion, Arts and Culture. This council followed the entire construction process from its planning phase to the actual construction.

The facility in Krems/Stein was built in the mid 1990s as the first mobile flood protection measures along the Danube in Lower Austria after the floods of 1991. Feasibility studies were initially carried out in the other Danube municipalities - there were no actual structural implementations of the measures.

IP_2016_EA229

Flood protection for the Danube in Lower Austria - development and outlook

Dietmar Pichler, Dipl.-Ing.¹; Norbert Knopf, Dipl.-Ing.1

RISK GOVERNANCE AND POLICIES (OBJECTIVES, STRATEGIES, COMMUNICATION)

(2)

INTERPRAEVENT 2016 – Extended Abstracts | 43

It was only after the floods of 2002 and the positive example set by the Krems/Stein facility as to the successfully tried and tested operability and control of these mobile systems, that the remaining mu- nicipalities in Lower Austria began to realise their corresponding systems. After the first agreement was concluded in 2006 in accordance with Article 15a of the B-VG (Federal Constitutional Act) between the Federal Government and provinces of Lower Austria, Upper Austria and Vienna, concern- ing flood protection projects in the area of the Austrian Danube (and in 2013 the identical second agreement) to secure the funds, they began in 2007 with the successive upgrading of the flood protec- tion facilities along the Danube River in Lower Austria. The aim behind this effort was to fully extend and develop the protection systems along

the Danube River in Lower Austria by 2023. After the flood of 2013 this target was revised to 2019.

The funding to render all the settlement areas along the Danube River in Lower Austria flood-proof would amount to over € 400 million. At the time of the „flood of the century“ in June 2013, many measures were already in place and as a result it was possible to prevent significant damages in the local area (e.g. the Ybbs flood protection, where an investment of approximately € 24.0 million was able to prevent damages of around € 39.0 million, basing the figures on the flood of 2002). The largest facility in Lower Austria is the one in Weißenkirch- en i. d. Wachau. It is almost 3,000 m long and is made up of approx. 6,500 m2 mobile elements when fully constructed.

Advisory Design Council

Region representatives World Heritage Representatives

Proposal from townscape and landscape planners

Release of the definitive planning result

Poss. provision of internal townscape designers

DecisionlevelPlanninglevel Flood Planner Townscape and

Landscape Planners

Internal Townscape

Designers

Specify timeline

Coordinate with town and landscape planners

Coordinate with flood planners and contributing institutions or advisory design council

Proposal from the consensus planning to the advisory design council

If required, assistance in detailed solutions

Contributing bodies

Local Representatives Federal Monuments Office Environmental Ombudsman

Design proposals from townscape and landscape planners

Contributingbodies

Coordination: Division WA3Provisions of the townscape and landscape planners together with client municipality Control option in case of problems

Figure 1 i ere Figure e r i

Figure 1. Advisory Design Council Figure 2. Past floods on the Danube

KEYWORDS

flood protection; Danube; Lower Austria; Historical development; Framework conditions and Outlook

1 Regional Government of Lower Austria, Department of Hydraulic Engineering, St. Pölten, AUSTRIA, dietmar.pichler@noel.gv.at

Referenzen

ÄHNLICHE DOKUMENTE

When the economy is not at the ZLB, I find that an increase in government spending raises the debt-to-GDP ratio and thereby the degree of fiscal stress, lowering the price of

THE OPERATIONAL SCENARIO - THE 100-YEAR FLOOD 06/2013 In the areas where the flood protection measures have already been implemented, they have proven themselves fully and

We provide upper and lower bounds on the length of the shortest non-trivial element in the derived series and lower central series in the free group on two generators.. The

Federal Department of the Environment, Transport, Energy and Communications DETEC Swiss Federal Office of Energy SFOE. Application for access to

The construction licence is no longer the responsibility of the Federal Council, but is now awarded by the Swiss Federal Department of the Environment, Transport, Energy

Overview of licensing procedure for new nuclear power plants in accordance with the Swiss Federal Nuclear Energy Act. - Safety assessments (esp. by the ENSI) -

To achieve this goal, there is a need to develop technologies and concepts enabling the intelligent generation, transformation, use and storage of energy in the buildings

The Federal Ministry of Finance has now tightened the requirements for eliminating such VAT liability: It now ad- ditionally requires the supplier to repay the already