Welcome to the 6 th European MELCOR User Group Meeting

6

th

EMUG Meeting, Bratislava,

Slovakia,

15 – 16 April 2014

Juraj Jančovič juraj.jancovic@vuje.sk

(2)

6

th

EMUG meeting

Organized by VUJE a.s. and Slovak Nuclear Regulatory Authority together with VTS at VUJE in Bratislava, Slovakia

Convenient location and possibility to discuss with code developers,

Organized by members of the CSARP program on a yearly basis.

(3)

3

Agenda of the 6

th

EMUG meeting

Tuesday 15th April 2014

Group 1 Welcome, Code development – Chair: J. Jančovič

9:30 Welcome, Approval of agenda, VUJE/All, J. Jančovič

9:45 Overview of VUJE and Nuclear Safety Division Missions, VUJE, M. Cvan

10:05 UJD SR Activities and Severe Accident Management, UJD SR, J. Husárček

10:45 Coffee break

11:05 MELCOR Code Development and Assessment Status Report for 2014, SANDIA, L. Humphries

11:35 Overview of MELCOR code activities in IBRAE RAN, IBRAE, N. Mosunova

12:00 Lunch break

(4)

Group 2 Model development – Chair: Ľ. Kubišová

13:30 MELCOR Wetwell Modeling with SNAP Post Processing, SANDIA, P. Jesse

14:00 Status of PSI Air Oxidation Modelling, PSI, L. Fernandez-Moguel

14:20 SFP phase II simulation with PSI breakaway model, PSI, B. Jaeckel

14:50 Expansion of the model basis in MELCOR, KIT, P. Dietrich

15:15 Coffee break

15:35 CIEMAT's experience with MELCOR along 2013: nodalization and modelling in LWR, CIEMAT, C. Lopez

15:55 Spent fuel under severe accident conditions, PSI, B. Jaeckel

(5)

5

Agenda of the 6

th

EMUG meeting

Wednesday 16th April 2014, Group 3 Unit modeling, post-processing – Chair: B. Jaeckel

9:00 Experiences with the MELCOR code at Westinghouse WEG, W. Rapp

9:20 Analyses of severe accident sequences in the spent fuel pool of the VVER-1000 type of reactor with MELCOR 1.8.6, UJV, M. Kotouč

9:45 Advances in the ENEA activity on plant applications ENEA, F. Mascari

10:10 Coffee break

10:30 Evaluation of Filtered Containment Venting Systems with MELCOR for Extended Operation in German PWR, AREVA, M.G.Loeffler

10:50 Open source tools for MELCOR: 2014 update and application examples, UJV, P. Vokáč

11:15 MELCOR results offline presentation using the ATLAS simulator tool NUBIKI, L. Horvath

11:30 Conclusions, next meeting VUJE/All, All

12:00 Lunch break, End of meeting

(6)

- break refreshment, - lunch + beverages,

- social dinner, 15 April 2014, 18:30 h,

REŠTAURÁCIA HRAD Námestie A. Dub č eka 1 850 01 Bratislava

Walking distance – 12 minutes, 800 m,

Main group departs from hotel Danube at 18:00 h,

Car transport possible (much longer route) – ask Mr. Jan č ovi č .

- location of the next EMUG meeting.

(7)

7

Route to the restaurant

(8)

Name: conference Password: hoteldanube

Contact to organizer: Juraj.Jancovic@vuje.sk

00421 944 254 294

Referenzen

ÄHNLICHE DOKUMENTE

The secondary circuit input model is limited to two SGs connected to the double primary loop on natural circulation.. Secondary coolant in these two SGs is cooled by a

Model of the core barrel bottom lower grid (grid supporting movable assemblies). ∙ Old model — user defined SS, failure criterion 1200 K,

 C1-C2: Injection into RPV to terminate/mitigate MCCI inside the reactor cavity (by volume control system, accumulators and/or from SFP), maximizing heat removal from

- Containment Failure due to Pressure Rise at Vessel Failure - Human Reliability Analysis (HRA). - Fission Product Release from Core

Cold neighbour storing policy can only delay the heat up after fuel uncovery, but does not influence the boil down velocity of the spent fuel pool. PSI breakaway model shows

Total decay heat calculated by DCH and RN packages differ for LB LOCA scenarios (where huge MPs exist). not for SBO scenarios (MPs

Based on the observed behavior of this experiment and the previous integral test, radial propagation in prototypic full length assemblies would likely have occurred only after

Figure 5.2 Bundle temperatures as a function of axial height in the assembly at 5.0 kW simulated decay power and 12 hours elapsed for the test maximum (red squares), test