• Keine Ergebnisse gefunden

METHOD OF ESTIMATION FOR FLOOD DISCHARGES CAUSED BY OVERFLOW EROSION OF LANDSLIDE DAMS AND ITS APPLICATION IN AS A COUNTERMEASURE

N/A
N/A
Protected

Academic year: 2022

Aktie "METHOD OF ESTIMATION FOR FLOOD DISCHARGES CAUSED BY OVERFLOW EROSION OF LANDSLIDE DAMS AND ITS APPLICATION IN AS A COUNTERMEASURE"

Copied!
10
0
0

Wird geladen.... (Jetzt Volltext ansehen)

Volltext

(1)

METHOD OF ESTIMATION FOR FLOOD DISCHARGES CAUSED BY OVERFLOW EROSION OF LANDSLIDE DAMS AND ITS

APPLICATION IN AS A COUNTERMEASURE Toshio Mori1*, Tetsuo Sakaguchi1, Youji Sawa1

Takahisa Mizuyama2, Yoshifumi Satofuka3 Kiichiro Ogawa4, Nobuhiro Usuki4, Kousuke Yoshino4

ABSTRACT

When a landslide dam forms, it is essential at an early stage to estimate the flood discharge generated by overflow erosion, which is known to be the most common pattern for a dam to burst, as well as to promptly discuss emergency measures for reducing the flood discharge and to put a warning and evacuation system in place for residents in the downstream areas.

This report describes the result of the application of the “two-layer model” suggested by Ta- kahama et al. (Takahama et al., 2000) to the overflow and burst phenomena of the Tangjia- shan landslide dams formed due to the Wenchuan Earthquake in May 2008. Moreover, it de- scribes model sensitivity analysis of the flood discharge volume reducing effect of excavating landslide dams crown and makes model study on effective means of reducing the value of flood discharges caused by overflow erosion of landslide dams.

Key Words: Landslide dam, Outburst, Flood discharge, Two-layer model, Risk-analysis

INTRODUCTION

The impact of the bursting of landslide dams on flood discharge is a very important factor from the standpoint of preventing secondary disasters. However, not many studies or reports have been made on specific flood data, although a large number of cases of such bursts have been reported. For this reason, only modest progress has been made in research in this field up to now. The authors examined in detail the literature on a study of a flood caused by landslide dams that formed and burst on the Naka River in Tokushima Prefecture Japan in 1892, con- firmed that this study had a certain level of reliability and attempted a simulation with the

“two-layer model.” As a result of these efforts, the flood level was successfully approximated to some extent (Mizuyama et al., 2006; Satofuka et al., 2007a).

Next, a flood caused by landslide dams that formed and burst on the Mimi River in Miyazaki Prefecture Japan in 2005 was simulated using the records of outflow and inflow data of the

1 Director General, Sabo Frontier Foundation, Sabo-kaikan, Hirakawa-cho 2-7-4, Chiyoda-ku, Tokyo 102-0093 (*Corresponding Author; Tel.: +81-3-5216-5871; Fax: +81-3-3262-2201; rijicyou@sff.or.jp) 2 Professor, Graduate School of Agriculture, Kyoto University, Oiwake-cho, Kitashirakawa, Sakyo-ku,

Kyoto 606-8502 (mizuyama@kais.kyoto-u.ac.jp)

3 Professor, College of Science and Engineering Department of Civil Engineering, Ritsumeikan University, Noji-higashi 1-1-1, Kusatsu-city, Shiga 525-8577 (satofuka@se.ritsumei.ac.jp)

4 Asia Air Survey C.,Ltd. Shinyuri 21 Bldg., 1-2-2 Manpukuji, Asao-ku, Kawasaki-city, Kanagawa 215-0004 (ki.ogawa@ajiko.co.jp, usu.usuki@ajiko.co.jp)

(2)

power company dams in the upstream and downstream areas and so on, which succeeded in producing an approximate match (Chiba et al., 2007; Satofuka et al., 2007b). Consequently, the authors have decided that the “two-layer model” is an adequate model for analyzing over- flow burst phenomena associated with landslide dams.

In the Wenchuan Earthquake that occurred in May 2008, 35 landslide dams were formed counting the major ones alone. Based on information obtained via the Internet on one of those dams, called the Tangjiashan landslide dam, in the upper reaches of the Jianjiang River in Si- chuan Province, the authors attempted a simulation, the successful result of which was to produce a general match with the actual phenomenon.

In addition, in the case of the Tangjiashan landslide dam, it proved possible to reduce flood level by excavating the crown of the dam. As a result of a model study in which varying depths and widths of excavation were applied, we confirmed that deep excavation was an ef- fective means of reducing the flood level resulting from an overflow burst.

The “two-layer model” used in the calculation

For analysis of the transition process from a debris flow to a bed load transport-like collective flow, Takahama et al. (Takahama et al., 2000) focused on the essential difference in the constitutive law between the water flow layer and the gravel moving layer and suggested the

“two-layer model” with an analysis based on a governing equation for each layer. The two- layer model analyzes the governing equation for each layer based on the conservation law resulting from the introduction of the water flow flux through the interface between the water flow and the gravel moving layers and the momentum flux according to the velocity vector of the interface, which is described in Figure 1. This model is applicable cotinuously to every phenomenon from debris flow to bed road transport. Volumetric values of the water layer per units of time and area through the interface are defined as s. And Satofuka et al. (Satofuka et al., 2007b, 2007c) adopted governing equations for ss defined as erosion velocity of torrent side bank.

z

sT

sI

x, u, c

θ

PI

Pw

Ps

hw

hs

zb Water surface

Bed

Interface

Deposit layer Water flow layer

Concentration profile

Velocity profile

Gravel moving layer

Fig. 1 The two-layer model (Takahama et al., 2000, partialy revised)

Continuous equations (1) Water flow layer

1

2 1

B ss h x s

h Bv B

1 t Bh B

1 w

T I w w 1 w 1

+

= +

(1)

(3)

(2) Gravel moving layer

1 1 1

1

1 2 1

B ss h s x s

h Bv B t Bh B

s T I T s s

s = +

+

(2) (3) Sediment continuous equations in gravel moving layer

⎟⎟

⎜⎜

+

= +

1 1

* 1

1

1 2 1

B ss h s x c

h Bv c B t Bh c B

t T T s s s s

s γ

(3)

(4) Temporal change of torrent bed elevation

2 1 T b

B s B t z =

(4) (5) Temporal change of width of torrent

ΔB(both banks)×H=2×ss×Δt×h

1

2 1

H ss h t

B t

T

=

(5) (6) Erosion velocity rate of torrent bed

Erosion velocity equations are applied the equations find in Egashira et al. (Egashira et al., 1997) .

( e)

t

T v

s = tanθθ (6)

(7) Erosion velocity rate of torrent side bank

t t t

T v

h H ss h

1 1

1 1

= +

α (α=1001,500) (7)

where, θ; torrent gradient, θ; equilibrium gradient corresponding to the average density of the entire layer, ; width, ; thickness of the moving layer (hw; thickness of the water flow layer,

hs; thickness of the gravel moving layer, ht; thickness of the entire moving layer), v ; mean velocity (vs; mean velocity of the gravel moving layer, vw ; mean velocity of the water flow layer, vt ; mean velocity of the entire moving layer), γ; correction factors, ; averaged sediment concentration of the gravel moving layer, (=0.6); sediment concentration of the deposit layer, s; volumetric values of the water flow layer per units of time and area through the interface, witch calculate as in the state of two layers defines =c/2, s; erosion rate, ss; velocity of side bank erosion, z; torrent bed elevation, α; side erosion coeficient. Still, subscript 1 shows before bank erosion.

Side bank erosion

Side bank erosion is applied discrives in Fig. 2.

B

Fig. 2 Schematic Diagram of bank erosion (Satofuka et al., 2007b)

where ; erosion volume of torrent bed, s; erosion volume of side bank, ; primary width,

;width of after side erosion, ; primary depth of torrent, ; flow depth, ΔB; erosion width of one side, dz; fluctuate elevation of torrent bed.

B

B ΔB

ΔB

dz V ΔB

V H

B ΔB

h Vs/2

B

h H

Vs/2 V

(4)

Equations of motion (1) Water flow layer

( )

( )

w s I w w

w I I w w w w w w

w w

x P h x P gh B

u x s

Bh v B

t h

v ρ β ρ ρ θ τ

ρ

=

+

1

1 2 sin

(8) (2) Gravel moving layer

( )

( )

b w s I s s

s I I s s s s s s

s s

x P h x P gh B

u x s

Bh v B t

h

v ρ β ρ ρ θ τ τ

ρ

γ +

+

=

+ +

1

2 1

1 sin

(9) where ρ; averaged density (ρs; averaged density of the gravel moving layer, ρw; averaged density of the water flow layer), ; gravitational acceleration, ; x-direction velocity at the interface, τw; shear stress to the interface, τ; shear stress to the torrent bed, w; pressure acting the water layer integrated from the interface to the free surface, s; pressure acting the gravel moving layer integrated from torrent bed to the interface, ; pressure at the interface,

γ`βsβw; correction factors for the vertical distributions of velocity, sediment concentration and density respectively.

Pressures

Pressures ws are rigidly describes below.

θ ρ gh cos Pw w w2

2

=1

(10)

(σ ρ ) ρ ( ) θ

ρ / gh cos cdz' dz gh h h cos

P w w w s

s z w w

s ' ⎥⎦ + +

⎢⎣

= 1 ∫ ∫01 21 2

2 1

(11) where z'=z/hS, c is sediment concentration, height z from torrent bed.

Shear stress

The shear stress to the torrent bed are evaluated using the model found in Egashira et al.

(Egashira et al., 1997) .

Composition rule are as follows.

d f

y τ τ

τ

τ = + + (12)

d s

w p p

p

p = + + (13)

s s

y p φ

τ = tan (14)

( )

{

1 c 53 /c2 3

}

d2( u / z 2

kf / /

w

f =ρ

τ )

)

(15)

(

1 e2

)

c1/3d2

(

u/ z 2 kg

d = σ − ∂ ∂

τ (16)

θ ρ gcos z

/

pw ∂ =− w

∂ (17)

(

2

2 3 / 1

2c d u/ z

e k

pd = gσ

)

(18)

(

s d

) (

*

)

1/5

s / p p c/c

p + = (19)

where d; mean diameter, φ; internal friction angle of the sediment (=35.0°), σ; sediment density, τ; shear stress, ; pressure, τ; surrender stress, τf; shear stress by the disorder of vacancy water, τ; shear stress by the un-elasticity collision of sediment particle, ;

(5)

pressure of the vacancy water, ; stress of the particle frame, ; pressure of the collision of sediment particle. The distribution revision coefficient assumed it 1 for simpleness and easiness entirely. , g are experienced constant value, witch are .25 and .0828 each, and e is repulsion factor (=.85).

Shear stress to the torrent bed as follows.

s s s w y

b τ ρ f v v

τ = + (20)

( w) s s s

s

y c gh

c

c σ ρ θ φ

τ cos tan

5 1

*

⎟⎟⎠

⎜⎜⎝

=

(21)

( )

( w) w s

e w

c

c φ

ρ ρ σ

ρ

θ σ tan

tan +

=

(22)

( ) ( )

( )

{ w s } e ( w )s e s s

s w

z z yk z z ext yk

c c c c

G b gh b

φ θ

ρ σ θ ρ

σ ρ

τ τ

tan cos

1 sin

1 1

5 1

*⎟⎟

⎜⎜

+

=

= = =

(23)

c d k c

s s f

3 1

0

1 ⎟⎟⎠

⎜⎜⎝⎛ − η =

(24)

( )

s I w I w w s w

w

gh u v u v f

W gh

=

=ρ τ

(25)

2

0

0 ln1 1

1 1

⎟⎟

⎜⎜

+

⎟⎟

⎜⎜

+

= η

η

κ w w

w

h f h

(26) ( ) ( 23)

(

2

)

13

3 5

1 1

s w g s f s

s k e c

c k c c

f = +

ρ σ

(27) when Gyk 0

( ) 4( ) 52 ( )32 2 2

2 3 16

225

⎟⎟

⎜⎜

⎛ − +

+

= d

G h W G W W G W G c f

fs s yk yk yk yk s (28)

when Gyk =0

( ) 2

4

⎟⎟

⎜⎜

=

d c h f

fs s s

(29) where η0; scale of the sediment particle vacancy, τext(Z=Zb); shear stress for external force to the torrent bed, τyk(Z=Zb); surrender stress of directly upper surface of the torrent bed, τb; shear stress to the torrent bed, κ; Karman’s fixed number.

In case of torrent bed gradient are flat and resistance law for bed load transport is needed. We used Manning's resistance law when sediment concentration becomes less than 0.02 as Takahashi and Kuang did (Takahashi and Kuang., 1988).

3 1

2

h v v gn

b

τ = ρ

(30) where n is Manning’s roughness coefficient.

(6)

The Tangjiashan landslide dam in Fu River, in the upper reaches of the Jialin River, a left-bank tributary of the Yangtze River in Sichuan Province, China in 2008

For the Tangjiashan landslide dam, which formed in Beichuan County, Sichuan Province due to the China Wenchuan Earthquake in May 2008, excavation of the crown was carried out by the People’s Liberation Army as a countermeasure against a potential burst-caused flood, which produced significant results.

Based on information obtained via the Internet and the 90 m mesh topographic data from the Shuttle Radar Topography Mission (SRTM-3) before the disaster, we estimated the flood discharge resulting from an overflow burst under the conditions shown in Table 1. Subse- quently, we compared our result with the calculated estimate of the flood discharge with the excavation of the crown carried out.

Table 1 Values used in the calculation

Water density ρw 1.0 g/cm³

Gravel density ρs 2.65 g/cm³

Average grain size d 50 cm

Sediment layer density c* 0.6

Internal friction angle φs 35°

Coefficient of restitution e 0.85

As to the form of the landslide dam, a trapezoidal shape as shown in Fig. 3 was assumed.

H=82.65m Lu=約500m

α=30°

α

=30

°

H = 82.65 m Ld = Approx. 800 m α = 30°

Bed slope θ = Approx. 0.2°

B = Approx. 350 m

Lu= Approx. 500 m α = 30°

Fig. 3 Shape of the Tangjiashan landslide dam used in calculation

The longitudinal profile of the river bed is as shown in Fig. 4.

500 600 700 800

0 10000 20000 30000 40000 50000 6000

Additional distance (m)

Elevation (m)

0 Elevation (m)

Tangjiashan landslide dam

Fig. 4 River bed longitudinal profile read from SRTM-3

Fig. 5 shows a flood hydrograph for Beichuan City of an overflow burst resulting from the natural overflow of the landslide dam. The peak discharge was approximately 11,000 m3/s.

(7)

0 2000 4000 6000 8000 10000 12000

0 10 20 30 40 50

Elapsed time (h)

Discharge (m3 /s) Beichuan City

Peak discharge Approx. 11,000 m3/s

Coefficient used for side erosion equation: α=15,000

Fig. 5 Flood hydrograph in the case of a natural overflow

For the Tangjiashan landslide dam, members of the People’s Liberation Army risked their lives in order to excavate a channel 10 m deep and 7 m wide at its base in the crown of the dam, which led to a successful overflow at an early stage. The dam body with the channel ex- cavated was assumed to be as shown in Fig. 6 and the flood caused by the overflow burst was calculated accordingly.

7 m

10 m

Fig. 6 Dam body with channel excavated

Fig. 7 shows a hydrograph for Beichuan City downstream of the landslide dam. The peak discharge was calculated to be approximately 6,700 m3/s. This is almost equal to 6,500 m3/s mentioned in the May 2008 issue of the IAHR’s newsletter Hydrolink. (The value given in the April 2009 issue is 6,420 m3/s.)

0 2000 4000 6000 8000 10000 12000

0 10 20 30 40 50

Elapsed time (h)

Discharge (m3/s) Beichuan City

Peak discharge Approx. 6,700 m3/s

Fig. 7 Flood hydrograph with a channel excavated in crown

Fig. 8 shows the actual result of the flood obtained via the Internet overlapped with the calcu- lation of the flood with a channel in place. The changes in the water level of the reservoir are also shown in Fig. 9 including the actual result as well as the calculation.

(8)

0 2000 4000 6000 8000

20 40 60 80 100

流量 (m3 / s)

実績 計算値

690 700 710 720 730 740 750

20 40 60 80 100

水位 (m )

実績 計算値

Fig. 8 Flood discharge calculated values and actual results

Fig. 8 Flood discharge calculated values and

actual results Fig. 9 Change in water level Fig. 9 Change in water level

For the flood discharge, the actual result and the calculated result are roughly equal, although the peak duration according to the calculation is slightly longer. For the water level, the cal- culation shows a more remarkable reduction. This is apparently because that the total dis- charge is larger in the calculation, as is obvious from Fig. 8, and because large boulders con- tained in the dam body became entangled with each other to form an armor coat.

For the flood discharge, the actual result and the calculated result are roughly equal, although the peak duration according to the calculation is slightly longer. For the water level, the cal- culation shows a more remarkable reduction. This is apparently because that the total dis- charge is larger in the calculation, as is obvious from Fig. 8, and because large boulders con- tained in the dam body became entangled with each other to form an armor coat.

Fig.8 shows a result of a calculation with the side erosion coefficient (α) specified as 15,000.

The results of calculations with α specified as 1/10 of this value, or 1,500, and as ten times larger, or 150,000, are shown in Fig. 10 and Fig. 11, respectively, which yield significantly different results. The handling of the coefficient α is an important factor in affecting the re- sult.

Fig.8 shows a result of a calculation with the side erosion coefficient (α) specified as 15,000.

The results of calculations with α specified as 1/10 of this value, or 1,500, and as ten times larger, or 150,000, are shown in Fig. 10 and Fig. 11, respectively, which yield significantly different results. The handling of the coefficient α is an important factor in affecting the re- sult.

0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000

20 40 60 80 100

流量(m3/s)

実績 計算値

0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000

20 40 60 80 100

流量(m3/s)

実績 計算値

Fig. 10 Calculation with α = 1,500 Fig. 11 Calculation with α = 150,000

Effect of channel excavation on the crown

For the Tangjiashan landslide dam, the size of the flood discharge was reduced through the excavation of a channel 7 m wide and 10 m deep into the crown. To help work out how the size of the flood generated can vary according to the width and depth of such a channel, we made calculations for six cases as listed in Table 2.

200 20 200 200 2008 200 2008 200

8/6/8 12:00 08/6/9 0:00 8/6/9 12:00 8/6/10 0:00 /6/10 12:00 8/6/11 0:00 /6/11 12:00 8/6/12 0:00

Discharge (m3 /s) 2008/6/8 12:00 2008/6/9 0:00 2008/6/9 12:00 2008/6/10 0:00 2008/6/10 12:00 2008/6/11 0:00 2008/6/11 12:00 2008/6/12 0:00

Water level (m)

Calculation Result Calculation

Result

2008/6/8 12:00 2008/6/9 0:00 2008/6/9 12:00 2008/6/10 0:00 2008/6/10 12:00 2008/6/11 0:00 2008/6/11 12:00 2008/6/12 0:00 2008/6/8 12:00 2008/6/9 0:00 2008/6/9 12:00 2008/6/10 0:00 2008/6/10 12:00 2008/6/11 0:00 2008/6/11 12:00 2008/6/12 0:00

Calculation Result

Discharge (m3 /s)

Calculation Result

Discharge (m3 /s)

(9)

Table 2 Calculation cases

Excavation depth Excavation width Peak discharge

Case 1 10 7 6,707 m3/s

Case 2 5 7 8,502 m3/s

Case 3 20 7 4,753 m3/s Case 4 10 3 7,261 m3/s Case 5 10 14 6,776 m3/s Case 6 10 20 6,875 m3/s

s a result, as shown in Fig. 12, we were able to confirm through our calculations that while A

varying the width (figure on the right) does not visibly alter the peak discharge reducing effect, increasing the depth (figure on the left) can produce a significant effect. This is apparently because the deeper excavation triggers the overflow sooner, reducing the amount of water re- tained upstream. Based on this result, we can say that for the purpose of reducing the value of the flood discharge resulting from the overflow burst of a landslide dam, lowering the crown of the landslide dam as much as possible or reducing the amount of water retained upstream of the dam as much as possible are effective measures.

0 2000 4000 6000 8000 10000

0 10 20 30 40

0 2000 4000 6000 8000 10000

0 10 20 30 4

経過時間(h)

流量(m3/s)

0 case1 case4 case5 case6

経過時間(h)

流量(m3/s)

case1 case2 case3

Fig. 12 Change of flood discharge volume with changing excavation depth and width

ONCLUSIONS

he authors applied an estimation method for flood hydrographs resulting from the overflow

hen landslide dams form and burst in future, their forms before the burst and the flood level following the burst should be investigated and recorded for further verification of the two-layer model, and this can be expected to contribute to improved calculation accuracy.

Elapsed time (h) Discharge (m3 /s)

Elapsed time (h) Discharge (m3 /s)

C T

bursting of landslide dams based on the “two-layer model”, the practicality of which has been confirmed in Japan, to the Tangjiashan landslide dam formed in Wenchuan Earthquake that occurred in May 2008. The resulting simulation generally matched the reported actual result when using a value of 15,000 (1,000 to 1,500 for cases in Japan) as the side erosion coeffi- cient. In addition, it has been confirmed by calculation that in the interests of reducing the flood discharge volume caused by overflow erosion, reducing the amount of inundation re- tained upstream is an effective method and the crown of the dam should be excavated at an early stage to generate overflow as soon as possible. The “two-layer model” may be rendered suitable for practical use following additional verification with further case examples and with compilation of the application method of parameters such as the side erosion coefficient into a manual. In particular, information about the rough shape of a dam makes possible analysis of which of a large number of landslide dams formed simultaneously represent a danger to areas downstream, which the authors believe will be applicable to future crisis management.

W

(10)

REFERENCES

Chiba, M., Mori, T., Uchikawa, T., Mizuyama, T. and Satofuka, Y.(2007) : Bursting process e dam caused by Typhoon 14 (2005) in the Mimi River, Miyazaki Prefec- ture and suggestions on warning and evacuation when a landslide dam is formed, Jour- Egash

on of Debris Flows, Slope Failures and Landslides, Vol.

Satof

trol Engineering (JSECE), Vol. 59, No. 6, p. 32–37.(In Satof

p. 901–906. (In Japanese with English abstract)

panese Takah

–686. (In Japanese with English abstract) of a landslid

nal of JSECE, Vol. 60, No. 1, p.43–47. (In Japanese with English abstract)

ira, S., Miyamoto, K. and Ito, T. (1997): Bed load rate in view of two phase flow dy- namics, Journal of Hydroscience and Hydraulic Engineering, Vol. 41, p. 789-794. (In Japanese with English abstract)

Mizuyama, T., Satofuka, Y., Ogawa, K. and Mori, T.(2006): Estimating the outflow discharge rate from landslide dam outbursts, Proceedings of the INTERPRAEVENT International Symposium on Disaster Mitigati

1 of 2, p.365-377.(In English)

uka, Y., Yoshino, K., Ogawa, K., Mori, T., Mizuyama, T. and Takahama, J.(2007a):

Simulation of a flood caused by the outburst of Takaiso-yama landslide dam, Journal of Japan Society of Erosion Con

Japanese with English abstract)

uka, Y., Yoshino, K., Mizuyama, T. Ogawa, K., Uchikawa, T. and Mori, T. (2007b):

Prediction of floods caused by landslide dam collapse, Journal of Hydroscience and Hydraulic Engineering, Vol. 51,

Satofuka, Y., Yoshino, K., Ogawa, K. and Mizuyama, T. (2007c): Consideration on method of estimation for flood discharges caused by outburst of landslide dam, Journal of Japan Society of Erosion Control Engineering (JSECE), Vol. 59, No. 6, p.55-59.( In Ja

with English abstract)

ama、J., Fujita, Y. and Kondo, Y.(2000): Study on analysis method for migration from debris flow to hyperconcentrated flow, Journal of Hydroscience and Hydraulic Engi- neering, Vol. 44, p. 683

Takahashi, T. and Kuang, S. F. (1988): Hydrograph prediction of debris frow due to failure of landslide dam, Annuals Disaster Prevention Research Institute, Kyoto Univ., No. 31, B-2, p. 601-615. (In Japanese with English abstract)

Referenzen

ÄHNLICHE DOKUMENTE

The map of large-scale risk for the Xinkai landslide (Fig.11) reveals that most of the high-risk areas occur on the building land-cover type, This is due to greater

Hence, this research aim to analyze the formation and duration of landslide dam formed in Kii Peninsula due to Typhoon Talas in 2011 based on topographical characteristics

The aim of the emergency work was to build temporary overflow channels to accommodate any flood on the level of 2 -year probability of exceedance before the

This example shows that when an overflow channel is installed in a landslide dam with a great difference in hydrostatic head, it is important to build a sabo dam at the terminus

The 2008 Iwate-Miyagi Nairiku Earthquake with a magnitude 7.2 induced numerous slope failures on steep inner valleys along the Ichihasama River, the Nihasama River and the

Based on this map, the slope failure locations were transferred to a 1:25,000 scale topographic map, using aerial photographs taken after the earthquake (taken by Asia Air Survey

Based on the above analysis, we reveal topographic index called RELM,responsibile for discrimination of earthquake induced landslide. This study is concluded as bellow. 1) Gullies

A new model for flood prediction and management of the Rhone river basin is presented. This 5500 km 2 mountainous catchment area contains 10 major hydropower plants with